Inspection kit standardised across a chemical complex
One detector test kit and record format adopted by four maintenance teams working across separate process units.

Background
A chemical complex ran detector testing from four maintenance teams, each carrying a different test kit and recording results in its own format. Reports arrived at the safety office in four layouts, which slowed the annual review.
What changed
The safety office was not short of inspection activity. The problem was aggregation: four teams, four kits and four record styles meant that comparing one process unit with another required manual reconciliation before every review meeting.
We started from the record rather than the tool. The inspection sheet was rebuilt around the fields the safety office actually used, then the kit was specified to match those fields — detector type, test method, result, technician and follow-up action. Where a team already owned a compatible unit, it stayed in service and only consumables and adapters were standardised.
Spares were the second change. Instead of each team holding its own reserve of test media and adapters, one pool sits at the site store and is drawn against the same order history. Replacement orders now arrive as one shipment rather than four small ones.